Commercial & residential helical pier installation—ICC-ES certified for projects of any size.

Colorado Helical Pier: New Construction & Foundation Repair Solutions

Office Hours: 08:00am-6:00pm

Foundation Helical Piles In Colorado

  • Home
  • Foundation Helical Piles In Colorado
Installer reading torque during helical pile installation in Colorado

Colorado Helical Pier installs PierTech steel helical piles under homes that have settled and under new footings on Colorado clay. Each pile turns into the ground until its installation torque reaches the value your design calls for. The formula that converts that torque into load capacity is published in ICC-ES evaluation report ESR-3969, so you can check the math yourself.

303-578-4414

Call us for information

What a foundation helical pile is and how its capacity is set

A foundation helical pile is a steel shaft with 1 or more helix plates that a machine screws into the ground until the torque reading shows the pile can carry its share of the structure. Colorado Helical Pier, based at 443 Verdos Dr in Elizabeth, installs PierTech 2-7/8-inch round-shaft piles with 8- to 14-inch helix plates across Colorado, in bare steel or hot-dip galvanized to ASTM A123. We use them to support settled homes, porches and additions, and to carry new homes, additions, decks and commercial foundations. Under ESR-3969, a pile’s ultimate compression capacity in pounds equals 9 times its final installation torque in foot-pounds. Most home installs take 1 to 4 days in any season, and the price comes as a written quote after an on-site assessment.

Steel helical pier bracket supporting a concrete foundation footing

The Steel, By Spec

ESR-3969 lists the parts and their material standards:

  • Shaft: 2-7/8-inch outside diameter round hollow steel, ASTM A500 Grade B or C, 0.217-inch nominal wall
  • Helix plates: 3/8 inch thick, 8, 10, 12 or 14 inches across, 3-inch pitch, ASTM A572 Grade 50
  • Couplers: ASTM A915 Grade SC8630, joined with ASTM A325 bolts
  • Corrosion: rated capacities assume a 50-year service life, with bare steel losing 0.036 inch of thickness over that span

Want to Get Helical Piles Services?

Settling or heaving: know the direction before you pick a fix

Helical piles stop settlement. On an existing house, they can’t stop heave.

Settlement means part of the structure dropped because the soil under its footing shrank or softened. A pile fixes that by carrying the footing’s load down through the soil that moved, to ground that holds the design torque. Where the house sank, jacks can lift it back toward level once the piles reach capacity, inside lift limits we agree on with you before work starts.

Heave runs the other way. Expansive clay swells when it takes on water, and it pushes up whatever sits on it. The bracket we use to tie a pile to an existing footing is PierTech’s Type A side-load bracket, sold as the Tru-Lift bracket, and ESR-3969 rates it for compression only. It holds a house up. It has no rated tension capacity, so it can’t hold a rising wall down.

Basement floors are their own case. If your basement slab was poured on the clay and separated from the walls, piles under the footings don’t hold it, and it rises and falls with the soil.

Water drives heave, so water control comes first. The Colorado Geological Survey (CGS) lists ponding water near a foundation and poor surface drainage among the causes of swelling-soil damage, along with plantings whose irrigation water soaks the soil next to the house. The International Residential Code (IRC) minimum for grading is 6 inches of fall within the first 10 feet from the foundation (Section R401.3).

Not every crack calls for steel. Of the new homes built on expansive soils each year, the CGS reports that 60% will see only minor damage over their useful lives and 10% will see “significant damage.” The on-site assessment for foundation repair in Colorado settles direction and cause first. The recommendation comes after, and sometimes the answer is water management, not piles.

New Footings Can Be Built To Resist Uplift

New construction changes the math. PierTech’s Type B direct-load bracket, the new construction bracket set in the concrete of a new footing or grade beam, is rated in ESR-3969 at 43.53 kips allowable in compression and 33.94 kips in tension (1 kip is 1,000 lb). That tension rating is what lets an engineer size a pile under a new footing to hold the structure down against swelling clay.

Eco-Friendly and Efficient Helical Pier Products

High-Quality Helical Pier Products

How torque proves what each pile can carry

Under the torque correlation method in ESR-3969, a helical pile’s capacity comes from the last torque reading taken when installation stops. Turning that reading into pounds takes 1 multiplication.

The equation is ultimate capacity = Kt x final torque, where Kt is the torque correlation factor. For the PierTech 2-7/8-inch pile, ESR-3969 sets Kt at 9 for compression and 8 for tension. Design loads use a share of that ultimate number:

  • With a site-specific soils report, the allowable load is 50% of the ultimate, a safety factor of 2.
  • For a home under the IRC with no site-specific soils report, the allowable load is 40% of the ultimate, a safety factor of 2.5.

A Worked Example At 4,000 ft-lb

Say a pile finishes at 4,000 ft-lb of torque.

  • Ultimate compression: 9 x 4,000 = 36,000 lb
  • Allowable with a soils report: 36,000 / 2 = 18,000 lb
  • Allowable under the IRC without one: 36,000 x 0.4 = 14,400 lb

The report caps installation torque at 8,840 ft-lb. At that cap, the pile’s soil capacity tops out at 79.6 kips ultimate and 39.8 kips allowable in compression, and 70.7 and 35.4 kips in tension.

The Bracket Can Set The Limit

The steel that ties the pile to the building has its own rating. In ESR-3969, the side-load repair bracket carries 27.9 kips allowable in compression. A repair pile that proves more soil capacity than that still gets a design capacity of 27.9 kips, the bracket’s limit.

Check The Numbers On Your Plan

Your written plan lists each pile’s location, depth and capacity. To find the torque a pile has to reach, multiply its design capacity by 2 (or by 2.5 under the IRC without a soils report) and divide by 9. An 18,000 lb design capacity needs 4,000 ft-lb. We monitor torque on every pile until it gets there.

Diagram comparing foundation settling with clay heave under a house
Helical pile new construction bracket set in rebar for a new footing

Which bracket and which pier fit your project

The direction of movement and the depth to firm material decide the hardware. Each part of the PierTech line answers a different Colorado condition.

  • A settled house, porch or addition on an existing footing takes a helical pile with the side-load Tru-Lift bracket. Compression is all a settled footing asks of it, and the bracket allows a controlled lift.
  • New homes and additions get the direct-load bracket, embedded in the new concrete. It’s rated for compression, tension and lateral load, and ESR-3969 calls for a footing at least 15.8 inches thick with it.
  • If a wall is heaving or a basement slab is doming, the water gets fixed first, since the side-load bracket has no tension rating to hold a wall down.
  • Shallow bedrock under a heavy structure points to push piers: 2-7/8- or 3-1/2-inch steel pipe driven hydraulically against the structure’s own weight, and they connect to the footing with the same Tru-Lift bracket used on helical piles.
  • Heavy commercial and industrial loads go on the Hercules pile, PierTech’s large-diameter pipe pile, rated to 500 tons for buildings up to 10 stories.
  • Corrosive ground needs its own design. ESR-3969 excludes soil with resistivity under 1,000 ohm-cm, pH under 5.5, sulfates over 1,000 ppm or high organic content, plus landfill and mine waste, and our engineers run corrosion analysis for sites like that.
  • Solar racking and utility structures bring lateral load. The report’s lateral rating comes from a 10-inch single-helix pile at least 16 feet deep in clay with a standard penetration test (SPT) value of 20 or more, so other conditions get designed project by project.
Testimonials

Check what Our clients say!

At Colorado Helical Pier, we take pride in delivering exceptional services to our clients. Don’t just take our word for it—read what our happy customers have to say about their experience with us!

597

customers have given rating for support

Average rating 5 / 5

When a pile reaches Colorado bedrock before it reaches torque

In parts of Colorado, a pile can meet bedrock before it builds its design torque. At that point the torque reading can’t prove capacity, and the engineer decides what happens next.

A 2024 Deep Foundations Institute paper, Colorado Geology & End Bearing Helical Piles on Bedrock, describes the state’s alluvial, colluvial and wind-blown deposits sitting on bedrock at varying depths. It names 2 problems helical piles meet there: refusal, where the pile stops advancing, and spin-out, where it turns on the rock without a meaningful torque reading. The paper covers design choices that help piles penetrate, plus the methods engineers use to estimate capacity when a pile spins out.

Bedrock can move, too. The Colorado Geological Survey has mapped areas of expansive, steeply dipping bedrock prone to differential heave in the City of Colorado Springs (map MS-32) and in Douglas County (publication SP-42).

We plan for it in 2 ways. When a soils report exists, our engineering team reads it during design, so a shallow bedrock layer logged in the borings shows up on paper before a machine shows up on site. And on shallow rock, the assessment may point to a push pier driven to that bearing layer instead of a helical pile. Our comparison of push piers vs helical piers for Colorado homes covers when.

Permits, engineering and special inspection

On a permitted job, ESR-3969 is the document that tells the building department what the PierTech system has been evaluated to do, and under which conditions.

Our engineering services cover geotechnical report review, load calculations, P.E.-stamped drawings, load test frame design and analysis, and corrosion analysis. Most home repairs move ahead without a stamped drawing. When a building department or lender asks for one, our engineers produce it.

ESR-3969 calls for continuous special inspection during installation under International Building Code (IBC) Section 1705.9. The inspector’s 11-item list includes:

  • the manufacturer and its certification of installers
  • tip elevation, installation torque and final depth for each pile
  • inclination and location of each pile
  • tightness of every bolted connection
  • full contact between direct-load cap plates and the top of the shaft

On a residential permit, the building department decides whether special inspection applies, so ask when you apply.

What sets the price of a helical pile job

The price follows the steel: how many piles the structure needs, and how far each one goes before the torque reading reaches the design value. Access to each pile location adjusts it from there.

Pile count comes from the loads along each footing and the capacity each pile and bracket can carry. Final depth gets confirmed during installation, because extension sections keep going on until the torque reaches the design value. That’s why we don’t quote over the phone. The price arrives as a written quote once we’ve seen the site, and you’re under no obligation to accept it.

Before any steel goes in, you’ll have:

  • a written plan showing how many piles, where each one goes, how deep and what it carries
  • P.E.-stamped drawings, when the permit needs them
  • the evaluation report number, ESR-3969, for the building department
  • advice on drainage and grading around the house for after the job

Frequently Asked Questions

How many helical piles does my foundation need?

Enough to carry the structure’s loads at the capacity each pile and bracket can prove. The engineer works from the weight along each footing, then spaces piles no closer than ESR-3969 allows, which is 4 average helix diameters center to center for axially loaded piles. With 10-inch helices, that’s 40 inches. The count goes in your written plan before work starts.

 

How deep do helical piles go in Colorado?

Deep enough to reach the design torque and any minimum depth set by the soils report, whichever comes deeper. Soil changes from lot to lot, so there’s no standard depth to promise in advance. Tension piles add 1 rule. The top helix sits at least 12 helix diameters below grade, which is 10 feet for a 10-inch helix.

 

Will helical piles stop my basement floor from heaving?

No. Piles carry the footings and the walls on them. A slab poured on the clay and separated from the walls moves with the clay, and controlling water under and around the house is where that fix starts.

 

Can helical piles hold a new building down on swelling clay?

They can be designed for it. ESR-3969 gives the pile a tension torque factor of 8 and rates the direct-load bracket at 33.94 kips allowable in tension, so uplift capacity gets proven by torque the same way compression does. That applies to new footings only, because the side-load repair bracket has no tension rating.

 

Do I need a soils report before piles go in?

Not always. For a home designed under the IRC, ESR-3969 allows design without a site-specific soils report if the engineer applies the 2.5 safety factor. Commercial projects use a geotechnical report, and it sets any minimum pile depth for expansive soil or frost. If you already have a report for your lot, have it ready at the assessment, and our engineers will read it before design.

 

What happens when soft soil keeps the torque low?

The pile keeps going. Extension sections get added until the torque reaches the design value. When soft ground runs deep, the engineer can change the helix setup. ESR-3969 covers plates from 8 to 14 inches, and when a pile carries more than 1 plate, they sit 3 diameters of the lowest plate apart.

Expert Foundation Solutions

Get A Written Plan For Your Foundation

Tell us what you’re seeing and where the property is. After the on-site assessment, you’ll get a written plan that lists each pile’s location, depth and capacity, plus the quote. No obligation.