Steel piers screwed down past the bentonite and into load-bearing strata, with torque readings that prove capacity on the day of install. For sinking foundations, new decks and additions, and commercial deep foundations. Colorado-based, PierTech certified, ICC-ES listed systems.
Tell us about the project. We get back to you promptly with next steps, or call 303-578-4414 to talk now.
No pressure, no obligation. Your details are used only to respond to this request.
Expansive clay swells when it gets wet and shrinks when it dries. The Colorado Geological Survey puts the swelling pressure at 20,000 pounds per square foot or more against foundations and slabs, so the damage shows up in a recognizable pattern. Walk the house and check for these.
1 of these on its own can be cosmetic. 2 or more that keep getting worse through the seasons usually mean the footing is moving with the clay, and patching the symptoms will not stop it. A 10-minute call is enough to tell whether an on-site assessment makes sense.
The Colorado Geological Survey calls expansive clay the state’s most damaging geologic hazard. Most Front Range homes sit on it. When the clay wets and dries it moves your foundation up and down, and a shallow fix moves with it.
A helical pier is a steel shaft with helix plates that we screw below the active clay until the installation torque confirms the pier is carrying its rated load. Your structure then rests on stable ground, not on the clay. Where push piers rely on the weight of the building to drive them, helical piers are driven by the machine, so a lighter home, porch or addition can be stabilized without stressing the foundation.
| Helical piers | Push piers | Poured concrete | |
|---|---|---|---|
| Install time | Usually 1-4 days | 1-4 days | Days plus 7-28 day cure |
| Stress on your foundation | None, machine driven | Uses building weight to drive | None |
| Winter and wet weather | Yes | Yes | Weather dependent |
| Capacity proof | Torque reading on site | Hydraulic pressure | Design only |
| Excavation | Minimal | Minimal | Significant |
| Best for | Homes, decks, additions, light commercial, new builds | Heavy structures | New builds in stable soil |
Every pier goes in the same way, whether it is underpinning a footing that has dropped or setting the footings for a new build. There is no concrete, no curing and no waiting on the weather.
Count and spacing come from the engineered plan and the load the footing carries, not a rule of thumb.
One pit at each pier location. On a repair, the pit exposes the footing. There is no trenching.
A hydraulic torque motor screws the helical lead into the ground. No impact hammering, no concrete.
Sections bolt on one at a time. Installation torque correlates to capacity, so when the gauge reaches the design value below the active clay zone, that pier is proven.
On a repair, the Tru-Lift bracket slides under the footing, the load moves onto the pier, and any planned lift is applied in controlled increments. On new construction, the pier is capped with a new-construction bracket that the footing, grade beam or post sits on.
Pits are backfilled and the surface restored. Most residential jobs finish in 1-4 days, and the structure carries load the same day.
We install PierTech Systems products and supply the same systems to contractors who run their own crews.
Round-shaft steel system evaluated under ICC-ES report ESR-3969 for the 2009 through 2021 IBC and IRC. This is the system for foundation repair, decks, porches, sunrooms, additions, light commercial and residential new construction.
PierTech’s patented large-diameter pipe pile. Specified for commercial and industrial buildings up to 10 stories, utility and transmission structures, and oil and gas sites.
Driven hydraulically to bedrock or bearing strata using the weight of the structure as the reaction. We use them where bedrock is shallow or the building is heavy enough to drive them to depth.
Mounts under the footing, carries the lift, and locks the final position with threaded rods, so the repair does not shift or rotate once set.
Lead and extension sections join with PierTech’s Cross Lock connection, bolted at each joint. Contractors: call 303-578-4414 for product pricing and availability on any of the above.
Talk to an estimatorA 10 minute call to understand what you’re seeing, the age and type of structure, and where in Colorado you are.
We inspect the foundation or site, review any soils or engineering reports, and tell you plainly whether piers are the right fix.
Pier count, placement, depth and capacity, with P.E. stamped drawings where required for permit.
Installation torque is monitored to verify each pier’s capacity. Most residential jobs finish in 1-4 days with your yard largely untouched.
The written quote lists every pier with its placement, target depth and capacity. 6 things set the number.
Set by the length of footing that is moving and the load it carries. 1 sinking corner takes fewer piers than a full perimeter.
Piers run until the torque reading confirms capacity below the active clay zone. Deeper bearing means more extension sections.
A deck, a 2-story addition and a commercial slab each call for a different pier. Standard helical piers cover most homes. Hercules piles cover heavy structures.
Holding the foundation where it is takes less time per pier than lifting it back toward level.
Exterior piers with open yard access go faster than interior piers set through a basement slab.
P.E. stamped drawings and load testing are added only when your permit, lender or insurer requires them.
The assessment ends with a written quote, and there is no obligation to go ahead.
Our crews and equipment are based in Elbert County and travel statewide. Commercial and new-construction work goes anywhere in the state; residential repair is scheduled by region.
Call 303-578-4414Yes. The steel pier is anchored below the moving soil and is not affected by the wet-dry cycle that caused the damage. It does not need maintenance once installed.
Yes. Helical piers are screwed in, not poured, so frozen ground, snow and cold do not stop the work or change the schedule.
Most residential repairs and deck pier sets take 1-4 days. We dig small access pits at each pier location rather than trenching, and backfill when done.
Often, yes. Once piers are at capacity we can apply lift to close cracks and re-level floors. How much lift is safe depends on the structure, and we tell you before we start.
Not to get an assessment. If your permit office, lender or insurer requires engineered drawings, our engineering team provides P.E. stamped designs and load testing.
For most homes, decks and light commercial buildings we recommend helical piers because they do not load your foundation during install and their capacity is verified by torque. Push piers suit heavy structures with substantial concrete footings.
Yes. We install for builders and GCs across Colorado and supply PierTech helical piles, Hercules piles, push piers and brackets for crews who install their own.
As deep as it takes to reach competent soil below the active clay zone. That depth changes from one lot to the next, which is why the torque reading on each pier, not a fixed length, decides when to stop.
PierTech’s helical pile system is evaluated under ICC-ES report ESR-3969 for the 2009 through 2021 IBC and IRC. Your building department or engineer can review the report directly.
Same steel screw-in system. “Pier” is the usual word when it underpins an existing foundation, “pile” when it forms a new deep foundation. We install both.
Yes. Because they are screwed in rather than poured, they can be backed out and reused. That matters for temporary structures, solar arrays and sites with environmental restrictions.
Call for an on-site assessment, or send the form and we get back to you promptly.