Helical pier installation, all of Colorado

Your foundation stops moving the day the piers go in

Colorado clay heaves and settles every season. We drive steel helical piers below it, prove every pier’s capacity by torque before we leave, and your home, deck or build sits on stable ground for good. ICC-ES listed systems, engineering support when the project needs it, crews based in Elizabeth.

0psfswell pressure Colorado clay can put on a foundation
1-4 daystypical residential install, any season
0cureno concrete, load the pier the same day
On-site assessment

Tell us about the project

We get back to you promptly. No obligation.

Prefer to talk? 303-578-4414
Check the house first

5 signs the ground is moving your foundation

Foundation damage in Colorado usually comes from soil movement, water intrusion or prolonged moisture exposure, and the signs are easy to read once you know them. Walk the house and look for these.

  • Cracks in walls or floors, vertical, diagonal or stair-step
  • Doors or windows that stick or will not close properly
  • Floors that slope, sag or sit uneven
  • Gaps opening between walls and ceilings or floors
  • A porch or stoop settling away from the house

Caught early, this is a stabilization job. Left alone, the damage gets worse and the repair gets bigger. A 10-minute call tells you whether an on-site assessment makes sense.

Why patching it does not work

A patched crack treats the symptom. The soil under the footing is still moving. A helical pier is screwed below it until it reaches the load-bearing capacity the plan calls for, and the structure rests on that, not on the clay.

What you are paying for

Three things a cheaper fix cannot give you

Mudjacking, epoxy and shallow piers all stay inside the clay that caused the problem. A helical pier is driven until it is below it.

01

Depth past the problem

Piers are screwed down until they reach soil that does not swell or shrink, below the zone where seasonal moisture changes move Front Range clay. The structure then rests on that layer, not on the clay.

02

Proof on the day

Installation torque is read on every pier and converted to load capacity. The readings are recorded for every pier and available to you and your engineer.

03

Engineering behind it

ICC-ES listed PierTech systems, geotech review, load calculations and P.E. stamped drawings when your permit, lender or insurer wants them.

Where they go

Pick your project

Stop settlement, then lift what can be lifted

  • Stair-step cracks, sticking doors and sloping floors are the usual triggers
  • Brackets transfer the wall load onto the piers; no weight is put on your foundation during install
  • Lift is applied in small, controlled steps to close cracks where the structure allows
  • Small access pits, backfilled when done. Most homes take 1-4 days
Start a repair quote
Helical pier bracket under an existing foundation

Footings you can build on the same day

  • Replaces poured concrete footings for decks, porches, sunrooms and additions
  • No excavation, no cure time, set below the frost line
  • Installed below the frost line and the active clay
  • We work directly with homeowners and with your contractor
Get a deck pier quote
Helical piers set for a residential deck

A deep foundation that does not wait on weather

  • Helical piles for new homes on expansive or fill soils
  • Designed to your load specifications and soils report
  • Installed in winter without schedule slips
  • P.E. stamped drawings for permit
Talk to an estimator
Helical piles for new construction

Capacity for buildings, boardwalks, solar and utility

  • Helical piles, large-diameter Hercules piles and push piers
  • Geotech review, load testing and value engineering
  • Minimal site disturbance in environmentally sensitive areas
  • Statewide crews and supply for installers
Request a commercial quote
Commercial helical piles
The process

From your call to a pier under load

Four steps, and you know the cost before anything is dug. Scroll through to see what happens at each one.

Call 303-578-4414
Day 0, 10 minutes

We talk through what you are seeing

Type and age of the structure, the symptoms, where in Colorado you are. We tell you right away if piers are likely the answer.

On site

Assessment and soils review

We inspect the foundation or site and read any soils or engineering reports you have. No obligation.

In writing

Engineered plan and quote

Pier count, placement, depth and capacity. P.E. stamped drawings where the permit needs them.

1-4 days

Install, verify, backfill

Installation torque is monitored to verify each pier’s capacity. Lift is applied where the structure allows. Pits are backfilled and the site is cleaned.

What goes in the ground

The steel we install, and what it is rated for

Every system below is a PierTech Systems product. We install them and supply the same systems to contractors who run their own crews. The plan decides which one goes under your structure, not what happens to be on the truck.

ICC-ES report ESR-3969, 2.875 inch helical pile system

Helical piers and piles

Steel shafts with helical plates, screwed into the ground until each pier reaches the load-bearing capacity the plan calls for, then spaced at calculated intervals to carry the structure. On a repair, brackets attach at the foundation base and transfer the load onto the piers. Used for home and commercial foundation repair, new construction, decks, porches and sunrooms, boardwalks, utility, alternative energy, and oil and gas foundations.

Patented large-diameter pipe pile, up to 500 tons

Hercules pile

PierTech’s patented Hercules Pile is built for commercial and industrial loads that standard helical piles were never meant to carry: buildings up to 10 stories, transmission and distribution structures, and oil and gas facilities. It installs with minimal site disturbance, which matters on tight urban sites and next to existing structures.

2 7/8 and 3 1/2 inch shafts, galvanized or bare steel

Push piers

Hydraulically driven pipe sections pushed through weak soil to solid load-bearing strata, then locked to the foundation with the Tru-Lift Bracket. Our pick where bedrock or bearing strata sit close to the surface. Where the stable layer is deeper, helical piers are the better tool, and we tell you which one your site needs.

Patented bracket and coupling, ESR-3969

Tru-Lift Bracket and Cross Lock connection

The Tru-Lift Bracket sets under the footing, carries the lift and is locked in place with a slider block and threaded rods, so the repair does not rotate or shift once set. Pier sections join with the patented Cross Lock connection: steel on steel, torque contained in the coupling, no bolt holes to deform.

Contractors and engineers: call 303-578-4414 for product pricing, availability and installer training.

Before, during and after

Engineering support, when the project needs it

Most home repairs do not need stamped drawings. When yours does, because the permit office, lender or insurer asks, you do not go looking for an engineer. Our engineering support covers the project from the soils report to the load test, with more than 25 years of expertise in foundation systems behind it.

  • Geotechnical report review and interpretation
  • Foundation design to your load specifications and soil conditions
  • Value engineering and pre-design consulting
  • Design of custom parts, piles and projects
  • Corrosion analysis for foundation life span
  • Engineered drawings and P.E. stamped projects
  • Load test frame design, analysis and review
  • Support before, during and after installation
No surprises

4 things that set your price

There is no flat rate for piers, and a number quoted over the phone is a guess. Your quote comes in writing after the assessment, and these 4 things decide it.

01

Pier count

The assessment sets how many piers the structure needs and where each one goes. A settling porch takes fewer piers than a full foundation perimeter.

02

Depth to bearing soil

Each pier is driven until it reaches the load-bearing capacity the plan calls for. The deeper the stable layer, the more pier sections go in.

03

The system

Standard helical piers cover most homes, decks and additions. Push piers suit shallow bedrock. Hercules piles carry commercial and industrial loads. Each is priced differently.

04

Engineering and permits

P.E. stamped drawings and load testing are added only when your permit, lender or insurer requires them.

You know the cost before anything is dug, and there is no obligation to go ahead.

Before you call

Questions we hear every week

Is a helical pier permanent?

Yes. The steel pier is anchored below the moving soil and is not affected by the wet-dry cycle that caused the damage. It needs no maintenance.

Can you install in winter?

Yes. Piers are screwed in, not poured, so frozen ground, snow and cold do not stop the work or change the schedule.

Will you lift my house back to level?

Often, yes. Once piers are at capacity we apply lift to close cracks and re-level floors. How much is safe depends on the structure, and we tell you before we start.

How much of my yard gets dug up?

Small access pits at each pier location, not trenches. We backfill when done.

Do I need an engineer’s report first?

Not for an assessment. If your permit office, lender or insurer requires engineered drawings, our engineering team provides P.E. stamped designs and load testing.

Helical or push piers for my house?

For most homes, decks and light commercial buildings we recommend helical piers: they do not load your foundation during install and capacity is verified by torque. Push piers suit heavy structures with substantial concrete footings.

Do you work with contractors?

Yes. We install for builders and GCs across Colorado and supply PierTech helical piles, Hercules piles, push piers and brackets to crews who install their own.

How fast can you come out?

Call and we will give you the next available assessment date for your area. Residential visits are grouped by region.

How much does it cost?

It depends on how many piers the structure needs, how deep they have to go to reach bearing soil, and which system the job calls for, which is why we do not quote over the phone. The assessment ends with a written quote. No obligation.

How deep do the piers go?

Until they reach the load-bearing capacity the plan calls for. Depth depends on where the stable soil or rock sits on your site, so it is set by the ground, not by a standard length. The torque reading on each pier confirms it.

Is the system code-approved?

Yes. The PierTech 2.875 inch helical pile system we install, with its Cross Lock connection, holds ICC-ES evaluation report ESR-3969, which building departments and engineers recognize.

Helical pier or helical pile, what is the difference?

Same steel shaft and helical plates, different job. Helical piles are used for deep foundations on new construction. Helical piers are used for underpinning and repairing existing structures. Both are screwed in and torque-verified the same way.

Can the piers be removed later?

Yes. Because they are screwed in rather than poured, helical piles and piers can be removed and reused, which is part of why they suit boardwalks and environmentally sensitive sites.

What do I get when the job is done?

The installation torque reading for every pier, converted to capacity, plus P.E. stamped drawings where the permit called for them. Keep them with the house file.

On-site assessment

Find out what it takes before the next wet season

Two taps and a phone number is all we need to get started. We get back to you promptly.

Colorado Helical Pier, 443 Verdos Dr, Elizabeth, CO 80107contact@coloradohelicalpier.comOpen 8am-6pm
Assessment303-578-4414
Call nowAssessment